Nutanix Certified Professional – Business Continuity (NCP-BC) Practice Exam
Prepare for the NCP-BC 7.5 exam with 669 practice questions across its four sections — interpreting and configuring BCDR requirements, testing solutions, performing recovery tasks, and troubleshooting failures — with Learn mode for instant feedback and a timed Exam mode.
Start 24-hour free trial →NCP-BC exam at a glance
- Vendor
- Nutanix
- Exam code
- NCP-BC 7.5 (leads to the NCP-BC 7 certification)
- Certification
- Nutanix Certified Professional – Business Continuity (NCP-BC)
- Level
- Professional
- Format
- 75 multiple-choice and multiple-response questions; no hands-on lab
- Duration
- 120 minutes
- Passing score
- 3000 on a scaled range of 1000–6000
- Cost (USD)
- $200 per attempt
- Languages
- English and Japanese
- Delivery
- Remote proctoring, or in person at select test centers
- Software tested
- Nutanix Disaster Recovery pc.7.5 and Prism Central pc.7.5
- Validity
- Three years
- Blueprint
- NCP-BC 7.5 exam blueprint guide: four sections, 16 objectives, no published weights
- Prerequisites
- No required course. Nutanix recommends about 2–3 years of IT infrastructure experience, 1–2 years with Nutanix, and 6–12 months of Nutanix DR experience
- Recommended training
- Nutanix Business Continuity Administration (NBCA)
Source: Nutanix — NCP-BC certification details and the NCP-BC 7.5 exam blueprint guide (PDF). Confirm the current edition and fee with Nutanix before scheduling.
About the Nutanix Certified Professional – Business Continuity (NCP-BC)
NCP-BC is Nutanix’s professional-level credential for disaster recovery and business continuity, and the exam is a core component of the Nutanix Business Continuity track. Nutanix says it measures your ability to plan, configure, execute, and troubleshoot disaster recovery solutions for complex scenarios within the Nutanix portfolio, and the 7.5 exam is tested against Nutanix Disaster Recovery and Prism Central, both pc.7.5. Where NCP-MCI treats DR as one section of platform administration, NCP-BC makes it the whole exam.
The 7.5 blueprint has four sections and 16 objectives, and Nutanix publishes no percentage weights. Expect scenario questions that start from a recovery requirement — a target RPO, a lost site, a failing replication — and ask you to choose the right design or action: asynchronous, NearSync, synchronous, or Metro replication; MST zero-compute or pilot light; planned or unplanned failover; or whether a failed third-party backup traces to Nutanix Guest Tools or to storage. The exam is multiple-choice with no lab. For general guidance on preparing for infrastructure administrator exams, see our platform administrator certification guide.
NCP-BC exam sections and objectives
Nutanix lists four sections and 16 objectives for NCP-BC and publishes no weights, so none are shown here. The counts below are the number of objectives Nutanix lists in each section.
Relate an RPO to asynchronous, NearSync, synchronous, or Metro replication; determine resource, scale, and Witness prerequisites; harden DR with network segmentation and approval policies; configure recovery plans, network mappings, and affinity policies; and choose between MST, pilot light, and bare metal, including NC2 networking prerequisites.
Decide when to run planned, unplanned, and non-disruptive test failovers and how to fail back, validate recovery plans, and test throughput and connectivity between sites, including required ports, logs, and native tools.
Perform self-service restore on Windows and Linux, restore from a recovery point or snapshot, execute a recovery plan for an outage (including the Migrate and Activate tasks for Protection Domains), clean up after a failover, and migrate from legacy Protection Domains to protection policies.
Troubleshoot replication bandwidth and post-failover VM connectivity, diagnose failed replication caused by network, storage, or permission issues, troubleshoot third-party backup failures and storage bloat, and fix DR setup problems with schedules, firewalls, users, and roles.
Who the NCP-BC exam is for
Nutanix describes typical candidates as people who run BCDR solutions every day:
- Systems and backup administrators responsible for protecting Nutanix workloads and proving that recoveries actually work.
- Architects and platform engineers who turn RPO and RTO targets into a DR design across sites and clouds.
- Database administrators and network engineers whose workloads and inter-site links decide whether replication holds up.
Nutanix lists no required course or prerequisite certification, and recommends about 2–3 years of IT infrastructure experience, 1–2 years with Nutanix, and 6–12 months of Nutanix DR experience. To see the roles this credential supports, review IT administrator roles and salaries in the Career Hub.
What this NCP-BC practice exam delivers
Learn mode
See the correct answer, the reasoning, and a link to the Nutanix page each question draws on, immediately after every question — built around the four NCP-BC sections.
Exam mode
A timed run for building pace. The real NCP-BC gives you 75 questions in 120 minutes, so practice working through recovery scenarios and ruling out near-miss options.
Organized by exam section
Questions are organized by Nutanix’s four sections, so you can see whether DR design, testing, recovery tasks, or troubleshooting needs more work. Nutanix publishes no weights, so none are claimed.
Source-linked explanations
Every answer cites the Nutanix page it draws from, so you can verify the reasoning against Nutanix’s own material before exam day.
Sample NCP-BC practice questions
Ten free sample questions spread across the four NCP-BC sections in proportion to the number of objectives in each, with full explanations and a Nutanix source link on each. The complete bank of 669 questions is available with the 24-hour trial.
A finance team can tolerate losing at most five minutes of data on a VM that replicates to a remote site over a WAN link. Hourly asynchronous snapshots are too coarse, and the link is not suited to synchronous replication.
Which replication option fits this requirement?
- Asynchronous replication on an hourly schedule
- NearSync replication
- A nightly backup copied to the remote site
- Synchronous replication with a 0-second RPO
Show answer & explanation
Correct: B — NearSync replication. NearSync sits between asynchronous and synchronous replication. Nutanix’s blueprint guide lists NearSync with a 1-minute to 15-minute RPO, which covers a five-minute tolerance without the latency demands of synchronous replication. Choosing among asynchronous, NearSync, synchronous, and Metro from a stated RPO is the core of Objective 1.1.
Why not the others: A hourly schedule leaves up to an hour of exposure. C leaves up to a day. D delivers a 0-second RPO, but the scenario rules it out because the WAN link is not suited to synchronous replication.
Source: Nutanix — Disaster Recovery →Two datacenters run AHV Metro with zero data loss. The team wants failover decisions made automatically if one site or the link between them fails, without risking both sites running the same VMs.
Which component supports that automatic decision-making?
- A larger inter-site link with more bandwidth
- A NearSync schedule on every protected VM
- A Witness deployed outside both sites’ failure domains
- A recovery plan with manual approval stages
Show answer & explanation
Correct: C — a Witness outside both sites’ failure domains. Nutanix packages its Witness service as a VM for AHV Metro deployments, and it can run on a single-node AHV cluster instead of the three-node witness cluster that earlier designs needed. Placed independently of the two sites, it gives the surviving site a third point of view to tell a site failure from a lost link, so only one side keeps running the VMs.
Why not the others: A more bandwidth does not decide which site is authoritative. B NearSync is a different replication mode and cannot arbitrate a split. D manual approval stages defeat the goal of automatic decisions.
Source: Nutanix — Witness service for AHV Metro →A team wants a cloud copy of its snapshots for recovery without paying for always-on compute at the recovery location. Snapshots should land in S3-compatible object storage and be recoverable on any Nutanix Cloud Platform deployment.
Which DR approach matches this design?
- Multicloud Snapshot Technology (MST) with a zero-compute deployment
- Metro Availability with a Witness
- Synchronous replication to a standing bare-metal cluster
- NearSync replication to a second on-premises cluster
Show answer & explanation
Correct: A — MST with a zero-compute deployment. MST replicates snapshots to S3-compliant object storage, uses the same DR policies and recovery plans as other Nutanix DR workflows, and supports immutable, WORM-enabled storage. Since AOS 7.0, MST DR no longer needs always-on compute nodes: snapshots sit in Amazon S3 or Nutanix Objects and can be recovered on any Nutanix Cloud Platform deployment.
Why not the others: B Metro keeps two live sites in step and needs standing infrastructure at both. C and D both replicate to running clusters, which means standing compute and capacity rather than object storage.
Source: Nutanix — MST zero-compute deployment → Further reading: PowerKram — Enterprise Security Practices →Before an annual audit, an administrator must prove a recovery plan works — that VMs boot and are reachable at the recovery site — without disturbing production VMs or interrupting replication.
Which operation should the administrator run?
- A planned failover
- An unplanned failover
- A test failover from the recovery plan
- A manual restore after pausing replication
Show answer & explanation
Correct: C — a test failover from the recovery plan. Nutanix describes test failovers as non-disruptive: they use replicated snapshots to validate a DR plan without affecting production. Running one is how you show that VMs come up and are reachable at the recovery site, and the blueprint’s Objective 3.4 then expects you to clean up the test entities afterward.
Why not the others: A a planned failover moves the production workload to the recovery site. B an unplanned failover is for a source that is unavailable and brings VMs up for real. D pausing replication adds risk and a manual restore does not validate the recovery plan itself.
Source: Nutanix — Data protection and disaster recovery → Further reading: PowerKram — DevOps Certification Guide →Replication between two sites began stalling intermittently right after a network team changed firewall rules between the datacenters.
What is the most appropriate first check?
- Rebuild the protection policy from scratch
- Raise the replication factor of the remote storage container
- Fail the VMs over to the remote site as a test
- Confirm the ports Nutanix requires for DR are still open between the sites and run a DR service reachability check
Show answer & explanation
Correct: D — confirm the required DR ports and run a reachability check. Objective 2.2 expects you to identify which ports must remain open between two sites and which native tools show connectivity, and Nutanix’s references include the ports that must remain open for DR and a DR service reachability check. A firewall change that coincides with the stalls points straight at the network path.
Why not the others: A rebuilding the policy discards working configuration without evidence. B the replication factor governs data redundancy inside a cluster, not connectivity between sites. C a failover is disruptive and would not diagnose the blocked path.
Source: Nutanix — NCP-BC 7.5 blueprint guide, Objective 2.2 →A user deleted a file from a Windows VM and wants to recover it from a snapshot without an administrator restoring the entire VM.
Which capability supports this, and what must be in place?
- A test failover, which requires a recovery plan network mapping
- Self-service restore, which relies on Nutanix Guest Tools being enabled for the VM
- Metro Availability, which requires a Witness
- A clone from a recovery point, which requires an approval policy
Show answer & explanation
Correct: B — self-service restore, which relies on Nutanix Guest Tools. Self-service restore lets a VM’s own users recover specific files from Prism Central snapshots, and it is one of the advanced functions that depends on Nutanix Guest Tools. Nutanix says these functions require enabling NGT from Prism Central. The blueprint’s Objective 3.1 asks for the requirements and for the Windows and Linux processes.
Why not the others: A a test failover brings up whole VMs in a test network, not individual files. C Metro Availability is synchronous replication for availability and has nothing to do with file recovery. D a clone creates a new VM from a recovery point rather than restoring one file, and approval policies relate to securing DR snapshots.
Source: Nutanix — Nutanix Guest Tools → Further reading: PowerKram — Platform Administrators Certification Guide →The primary datacenter has lost power and cannot be reached. The administrator must start protected VMs at the remote site from the latest replicated recovery points.
Which recovery plan option applies?
- Unplanned failover
- Planned failover
- Test failover
- Failback
Show answer & explanation
Correct: A — unplanned failover. An unplanned failover is the option for an outage in which the source site is not available: VMs start at the recovery site from the latest replicated recovery points. In legacy Protection Domain-based DR, the blueprint separates the Migrate task from the Activate task, and deciding between planned and unplanned recovery is Objective 3.3.
Why not the others: B a planned failover assumes the source is reachable, so it can finish a final sync and move workloads gracefully. C a test failover runs in an isolated test network without taking over production. D failback is the move back to the original site after recovery.
Source: Nutanix — Disaster Recovery (orchestrated failover and failback) →An organization protects VMs with Protection Domains configured cluster by cluster in Prism Element and is moving to Prism Central-based Nutanix Disaster Recovery.
Which Prism Central construct takes over the Protection Domain’s job of defining the replication schedule, retention, and recovery location?
- A recovery plan
- A category
- A protection policy
- An approval policy
Show answer & explanation
Correct: C — a protection policy. In Prism Central-based DR, a protection policy defines the replication schedule, retention, and target location, and VMs are associated with it through categories. A recovery plan then orchestrates failover. Knowing when and how to migrate from legacy Protection Domains to protection policies, including caveats and planning, is Objective 3.5.
Why not the others: A a recovery plan orchestrates failover, including network mappings and boot order, rather than defining the schedule. B a category groups VMs so a policy can target them and holds no schedule. D an approval policy gates actions on DR snapshots and does not replicate anything.
Source: Nutanix — NCP-BC 7.5 blueprint guide, Objective 3.5 →Asynchronous replication to a remote cluster is failing with skipped-snapshot alerts. Network connectivity and user permissions have been verified, but the remote storage container is nearly full.
What is the most likely cause, and what should the administrator do?
- A VM-VM anti-affinity conflict; remove the policy
- An NGT version mismatch; reinstall NGT on every VM
- A recovery plan with no network mapping; add one
- Insufficient storage at the remote site; free or add capacity and re-check the container’s space
Show answer & explanation
Correct: D — insufficient storage at the remote site. Objective 4.2 asks you to diagnose failed replication by cause — networking, storage, or permissions — and the scenario has already ruled out the first and last. A nearly full remote container leaves no room for incoming snapshots, so replication skips them until capacity is freed or added.
Why not the others: A affinity policies govern VM placement at recovery, not replication. B an NGT mismatch affects guest-level features, not snapshot replication between clusters. C a missing network mapping affects VMs after failover, not whether snapshots replicate.
Source: Nutanix — NCP-BC 7.5 blueprint guide, Objective 4.2 →A third-party backup product integrated with Nutanix keeps failing to take application-consistent snapshots of one VM, while other VMs back up fine.
Which check belongs at the top of the troubleshooting list?
- Whether the VM’s protection policy uses NearSync
- Whether Nutanix Guest Tools is installed in the VM and its connection to the cluster is working
- Whether the remote site has a Witness
- Whether the recovery plan has a stage delay
Show answer & explanation
Correct: B — check Nutanix Guest Tools in the VM. Objective 4.3 lists NGT not installed and a broken NGT link among the configuration causes of failed application-consistent snapshots from third-party backup tools. Because the failure is limited to one VM, a missing or disconnected guest agent is a better first suspect than anything cluster-wide.
Why not the others: A NearSync is a replication mode and does not decide whether one VM can take an application-consistent snapshot. C a Witness belongs to Metro and synchronous designs. D a recovery plan stage delay affects boot sequencing during recovery.
Source: Nutanix — Data protection and third-party backup integrations →Keep going: study & career resources
NCP-BC is the dedicated disaster recovery exam on the Nutanix path. Here is where to go as you prepare and plan what comes next.
Deep dive: NCP-BC format, DR design, recovery tasks, troubleshooting, and where it sits
Exam format and the 7.5 update
NCP-BC 7.5 is 75 multiple-choice and multiple-response questions in 120 minutes, at $200 per attempt, in English and Japanese, delivered by remote proctoring or in person at select test centers. The blueprint guide lists a passing score of 3000 on a scaled range of 1000–6000 and three-year validity. After a failed first attempt you get two more, with a seven-day wait between attempts; after three attempts there is a 60-day wait before you can ask Nutanix to reset them. Nutanix Community announced the exam open for scheduling in May 2026, with appointments starting June 9, 2026. Nutanix NCP-BC certification details →
Choosing a DR design
Section 1 starts from a requirement and asks for the right mechanism. The blueprint relates an RPO to asynchronous, NearSync, synchronous, or Metro replication, and its references list NearSync at a 1-minute to 15-minute RPO and synchronous replication at a 0-second RPO. Know the prerequisites each choice carries — CVM and storage resources, scale maximums such as VMs per category and per protection policy, application-consistent snapshot requirements, and the Independent Witness — and how recovery plans use network mappings and VM-host or VM-VM affinity. For cloud targets, know MST zero-compute versus pilot light, and Layer 2 subnet stretching as an NC2 networking prerequisite. Nutanix Disaster Recovery →
Testing and performing recoveries
Sections 2 and 3 hold 7 of the 16 objectives. They cover planned failover when both sites are healthy, unplanned failover when the source is down, non-disruptive test failover, failback, and recovery plan validation, then self-service restore, recovery from a snapshot or recovery point, post-failover cleanup, and migrating legacy Protection Domains to protection policies. Keep the failover options distinct: only a test failover leaves production untouched, and for legacy Protection Domain-based DR the blueprint separates the Migrate task from the Activate task. Nutanix data protection and disaster recovery →
Troubleshooting DR failures
Section 4 holds 4 of the 16 objectives and rewards a methodical order. Start with the network — replication bandwidth, firewalls and ports, network mappings, and post-failover causes such as an IP that was not retained — then storage capacity and container configuration, then permissions and roles. Guest-level causes matter too: for third-party backups, the blueprint names Nutanix Guest Tools not installed or a broken link as causes of failed application-consistent snapshots, and lists a deleted VM or an expiration date set too far ahead among the causes of storage bloat. NCP-BC 7.5 exam blueprint guide →
Where NCP-BC sits on the Nutanix ladder
NCP-BC passes you into the NCP-BC 7 certification, valid for three years. Nutanix lets you renew by passing an equivalent NCP-level exam in another track or the NCM-MCI exam, so NCP-MCI, whose third section covers DR and data protection at the platform level, is a natural companion. NCA is the foundational tier and NCM-MCI is the live-lab master exam. Nutanix recommends its Business Continuity Administration (NBCA) course, which the course page lists as a 16-hour self-paced online version. See all Nutanix practice exams on our Nutanix certification practice exams page.
Nutanix NCP-BC exam FAQ
How many questions are on the NCP-BC exam, and how long is it?
What is the NCP-BC passing score?
How much does NCP-BC cost, and how long is it valid?
Does Nutanix publish domain weights for NCP-BC?
What are the four sections of the NCP-BC exam?
Does NCP-BC include a hands-on lab?
Do I need a course or another certification before NCP-BC?
Is NCP-BC 7.5 the current version?
How does PowerKram access and payment work for the NCP-BC practice exam?
Start your free 24-hour NCP-BC practice trial
Full access to the NCP-BC question bank, both study modes, and source-linked explanations. No credit card required.
Start free trial →Prepare now, pay over time with Affirm & Klarna
Split the cost of full exam access into scheduled payments at checkout with Affirm or Klarna. Choose your plan when you check out.
